22.06.2010 ClampOn introduces hosted monitoring services
Data acquisition systems are normally placed on site and are connected to highly secure process networks.
- Read more
20.05.2010 ClampOn Sand Monitoring School
The ClampOn Sand Monitoring School was held in Jakarta on April 28th and 29th .
- Read more
18.05.2010 ClampOn awarded Industrial Research and Development contract
ClampOn, BP and Innovation Norway have agreed on a Joint Industry Program (JIP). – Research, Development, Delivery and Field Trials Project. The purpose of this one-year project is to develop a non-intrusive Corrosion-Erosion Monitoring (CEM) system for subsea applications.
- Read more
10.05.2010 Thank you for visiting us at OTC 2010
Thank you to all who visited our booth at OTC 2010 in Houston last week.
We enjoyed the inspiring conversations and the great interest in our products.
- Read more
23.04.2010 Visit ClampOn at OTC 2010
You are welcome to visit us at OTC 2010 in Houston, booth 5031,
May 3rd – 6th 2010.
- Read more
21.04.2010 ClampOn celebrates 15 years in field operation
Since 1995, more than 8000 sensors have been supplied for topside and subsea oil and gas installations around the world.
- Read more
31.03.2010 ClampOn Sand Monitoring School
ClampOn is happy to announce the first Sand Monitoring School in Indonesia.
- Read more
12.03.2010 ClampOn DSP Well Collision Detector
ClampOn introduces the DSP Well Collision Detector which is designed to prevent collisions involving sidetrack drilling within the proximity of existing wells.
- Read more
17.02.2010 ClampOn doubles its support contract portfolio
ClampOn has doubled its support contract portfolio in the course of the past three months.
- Read more
27.01.2010 ClampOn has recently received new contracts for sand monitors and PIG detectors
Our latest contract award is a special solution consisting of subsea PIG detectors with local light and reset, run on battery power for BP’s GERM project at Block 18 in Angola.
- Read more
25.01.2010 ClampOn nominated at the "Gullkronen 2010"
Rystad Energy is hosting the second, annual NCS award ceremony, Gullkronen, taking place in Oslo, Norway.
- Read more
18.12.2009 ClampOn donation to Save the Children
ClampOn has for several years supported the International Save the Children Alliance.
- Read more
10.11.2009 ClampOn Donation
ClampOn is supporting the organization CARE Egypt through BG Egypt Energy Challenge.
- Read more
28.10.2009 ClampOn to supply sand monitors to CPOC’s B17 gas project
ClampOn has received a contract from the Malaysian/Thai Joint Venture Company CPOC - The Carigali-PTTEP Operation Company, for the supply of 62 sand monitors for the B 17 gas development project.
- Read more
21.10.2009 ClampOn secures StatoilHydro TVCM contract
ClampOn will supply subsea sand monitoring sensors to the Tordis Vigdis Controls Modification project.
- Read more
20.10.2009 CEM Server 2.0 and CEM Client 1.0 Released
Two major software upgrades were released today by ClampOn for the Corrosion-Erosion Monitoring system (CEM).
- Read more
23.09.2009 ClampOn DSP-06 Compact Particle Monitor to Oselvar Project
ClampOn is ready to deliver subsea sand monitoring equipment to Dong’s Oselvar project.
- Read more
16.09.2009 Accurately detecting sand production at low flow rates and low velocities - a field case from the North Sea.
When monitoring sand with any system, flow velocity is an important factor. In some applications, low flow velocity can be a show stopper when trying to monitor sand production.
- Read more
14.09.2009 Thank you for visiting our stand at Offshore Europe 2009
We would like to thank you all for taking your time to visit our stand during Offshore Europe 2009 in Aberdeen last week.
We enjoyed meeting you and were glad that you had the chance to see our products on display as well as to discuss your requirements.
- Read more
07.08.2009 Come and see us at Offshore Europe 2009
You are welcome to visit us at Offshore Europe, stand # 1226, 8th – 11th September 2009.
- Read more
07.08.2009 ClampOn - the preferred solution
ClampOn received two new contracts for subsea sand monitoring and pig detection equipment last week. The contracts are for BP's Isabela field and Tullow Oil's Jubilee field, and it covers both ClampOn DSP Compact Particle Monitor and ClampOn DSP Compact PIG Detector.
- Read more
07.08.2009 ClampOn DSP Deepwater Particle Monitor and PIG Detector to BP's Isabela project in Gulf of Mexico
ClampOn has secured the order for several subsea sand monitors and PIG detectors to the Isabela field. Isabela lies in 6500 feet (1980m) of water and about 250 kilometres south-east of New Orleans. Expected startup is first quarter of 2011. The development will be tied back to the NaKika field.
- Read more
22.06.2009 ClampOn subsea monitors for Tullow Oil’s Jubilee project.
ClampOn has received a new order for subsea sensors for the Jubilee field off Ghana.
- Read more
13.05.2009 OTC 2009
Meet us again in Houston at the Offshore Technology Conference 2009. (Apr 09)
- Read more
13.05.2009 Thank you for visiting us at OTC 2009!
We wish to thank all participants for attending the show and visiting our booth. We look forward to seeing you again soon! (May 09)
- Read more
22.01.2009 ClampOn to supply deepwater particle monitors for the Tahiti project
ClampOn has been awarded the contract to supply subsea sensors to Chevron’s Tahiti project. Tahiti is believed to be one of the Gulf of Mexico’s biggest discoveries, and is estimated to hold 400-500 Mmbbl at more than 6000 meters below the seabed. (Jan 09)
- Read more
14.01.2009 Automatic reports and remote control via e-mail
ClampOn has released a program for receiving monitoring data via e-mail. (Jan 09)
- Read more
13.01.2009 Deepwater sensors from ClampOn to the Jubilee discovery
ClampOn has received a substantial order for subsea detectors for the Jubilee field. The Jubilee field is located off Ghana and is currently estimated to hold between 500 million and 1.8 billion barrels of oil, water depth is 1320 MSW and the project is due onstream in 2010. (Jan 09)
- Read more
02.12.2008 Sand Management Workshop
The Sand Management Workshop in Aberdeen in November turned out to be a great event. We were approx. 70 participants from both oil and service companies. (Dec 08)
- Read more
13.08.2008 Clampon at ONS 2008
ClampOn will be exhibiting at this year's ONS exhibition in Stavanger, 26. – 29. August. You will find us at Hall E, stand 568/5. (Aug 08)
- Read more
13.08.2008 Subsea in Angola
ClampOn will deliver Compact Particle Monitors for the Pazflor project in Angola. (Aug 08)
- Read more
25.07.2008 Employee wins scholarship
Andreas Dalsgård, one of ClampOn’s most recent employees, has been awarded the ABB scholarship for his work on supplying power through the USB port. (Sept 08)
- Read more
16.05.2008 Thank you for visiting us at OTC 2008!
Thank you for visiting our booth at OTC in Houston this year. We hope to see you again soon.
- Read more
30.04.2008 GoM and Brazil orders
ClampOn has received purchase orders to equip a number of subsea production manifolds in water depths of up to 8,200 FSW with their state of the art and industry leading subsea sand and pig detectors. (April 08)
- Read more
02.04.2008 Subsea contract received
ClampOn is selected for the supply of Subsea Sensors for the Skarv Idun subsea project (Mar 08).
- Read more
28.02.2008 Another Support contract
ClampOn have just been awarded a long-term contract for remote support, operation, and management of all sand monitors on one of the largest oil producers in the North Sea. (Feb 08)
- Read more
20.02.2008 Remote well test
By using the latest available communications solutions, ClampOn is now in a position to provide well test service from our office.
- Read more
20.02.2008 Remote well test
By using the latest available communications solutions, ClampOn is now in a position to provide well test service from our office. (Feb 08)
- Read more
25.01.2008 New sand monitoring software
ClampOn has released new versions of the market's leading sand monitoring software: ClampOn Sand Monitor 3.1 and ClampOn Sand Client 2.1.
- Read more
25.01.2008 New sand monitoring software
ClampOn has released new versions of the market's leading sand monitoring software: ClampOn Sand Monitor 3.1 and ClampOn Sand Client 2.1. (Jan 08)
- Read more
19.12.2007 Donation to Save the Children
ClampOn continues the tradition of giving a donation to Save the Children.
- Read more
19.12.2007 Donation to Save the Children
ClampOn continues the tradition of giving a donation to Save the Children. (Dec 07)
- Read more
29.11.2007 Compact sensor certified for installation in up to 3000 m water depths
After successful testing and certification, ClampOn has released the Compact sensor for installation in up to 3000 m water depth; the unit is available with single or dual electronics. For further information please contact your ClampOn office in Bergen, Norway or Houston, Texas.
- Read more
29.11.2007 Compact sensor certified for installation in up to 3000 m water depths
08.10.2007 ClampOn has been awarded a contract for delivery of subsea Leak Monitors
ClampOn has been awarded a contract for delivery of five subsea ClampOn DSP Leak Monitors to the Tampen Link project in the Norwegian sector in the North Sea (Sept 07).
- Read more
30.08.2007 Major contract has been awarded ClampOn for the supply of a combined Corrosion-Erosion/Sand Monitoring System
ClampOn has been awarded a major contract for the supply of a combined Corrosion-Erosion/Sand Monitoring System. (Sept 07)
- Read more
30.08.2007 ClampOn Corrosion-Erosion system commissioned on Total Franklin
ClampOn has recently commissioned the new Corrosion-Erosion Monitor on the Total Franklin installation in the North Sea. (Sept 07)
- Read more
28.08.2007 Product launch by ClampOn – SandQ (Quantifier)
ClampOn, the number one choice in sand monitoring systems, has added a new sensor to the ClampOn family. The new SandQ was released to the public at Offshore Europe in Aberdeen on 4th of September 2007. (Aug 07)
- Read more
20.06.2007 ClampOn still leads the market in sand monitoring
As the world's leading supplier of sand monitoring equipment, ClampOn is puzzled by recent announcements made by our competitors, who claim to have a majority of the market. For the past seven years, ClampOn has totally dominated the international sand monitoring market. (June 07)
- Read more
20.03.2007 Freidis Rehabilitation and Disabled Centre
On February 2nd 2007 the Freidis Centre in Lira, Uganda, was opened by the President of Uganda. The Centre has been built with the assistance of companies from Bergen, Norway, among them ClampOn. The initiative was taken by Framo Engineering AS and Frank Mohn AS (March 07.)
- Read more
08.03.2007 Subsea Sand Monitors to Shell in Brazil
Subsea Sand Monitors to Shell BC-10 Project in Brazil. ClampOn has received an order for delivery of 9 ClampOn DSP Deepwater Particle Monitors for the BC-10 project in Brazil. The field is located in the Campos Basin, approximately 120 km southeast from the city of Vitoria, in water depths of 1500 to 2000 metres. (March 07)
- Read more
19.12.2006 Donation to Save the Children
We have again followed our tradition and donated money to Save the Children instead of giving Christmas presents. Save the Children is doing a great job for children all over the world, and this year we have been supporting its work in Uganda.
- Read more
22.11.2006 Subsea Sand Monitoring Contract
ClampOn will deliver a large number of ClampOn DSP-06 Deepwater Particle Monitors to a Reliance project in India. Project start-up is planned for second quarter of 2008. Water depths at the block are as much as 2700 metres, although most of the subsea wells in phase-one of the project will be located at depths of less than 1200 metres. The project is India’s first deep-water gas development. (Nov. 06)
- Read more
06.09.2006 When Quality and Performance Counts
ClampOn Inc. of Houston has received an order for seven Subsea Deepwater Particle Monitors and six Subsea Deepwater Pig Detectors from AKS for BHP-Billiton's Gulf of Mexico asset SHENZI in Green Canyon (GC 609/610)
- Read more
15.03.2006 "Noise-Killer"
As a result of its continuous efforts to develop and improve the capabilities of its products, ClampOn can now announce the release of a unique filtering technique. The advantages of using a ClampOn ultrasonic sand monitoring system are enhanced by the new technique, which distinguishes sand noise from other noise sources that are not relevant to sand production even better than before.
- Read more
03.03.2006 Sensors for Total's Moho Bilondo
ClampOn has been chosen to supply subsea sensors for the Moho Bilondo project in Congo, West Africa. The scope of supply includes both particle monitors and pig detectors. Deliveries are scheduled to commence April 2006. (March 06)
- Read more
30.01.2006 CEMs for ChevronTexaco Erskine
ChevronTexaco has placed an order for 5 of ClampOn DSP Corrosion-Erosion Montiors (CEM) for installation at Erskine. (Jan 06)
- Read more
22.12.2005 Delivery to Block 18
The 20 subsea sensors for BP’s Block 18/Greater Plutonio offshore Angola have now been shipped. (Dec 05)
- Read more
13.12.2005 Sand Monitoring at Bibiyana
ClampOn has won a contract for supply of 12 ClampOn DSP Particle Monitors for Unocal’s Bibiyana field in northeast Bangladesh. This is ClampOn’s first contract for supply of a permanently installed sand monitoring system in Bangladesh. (Dec 2005)
- Read more
09.12.2005 Sand Client 2.0 Released
ClampOn has released version 2.0 of its popular Sand Client application. By providing full remote control of the sand monitoring systems to administrative users and viewing access to anyone on the network the client helps you establish ownership and an organization-wide understanding necessary to manage sand production. (Dec 05)
- Read more
11.11.2005 Topside Sand Detectors
ClampOn has received Letter of Intent for supply of 15 topside sand detectors to BP Tangguh project. (Nov. 05)
- Read more
24.10.2005 Subsea Klondike for ClampOn
ClampOn has received orders worth several million kroner for its subsea sand monitors. They are for the Statoil SRI and BP West of Shetland projects and are due for delivery by November 2005. (Oct 05)
- Read more
19.10.2005 ClampOn supports football team
ClampOn supports the local football team “FRØYA IL” for boys aged 15/16. (Oct 05)
- Read more
04.10.2005 Reliability counts
ClampOn wins large contract for supply of sand detectors to BP Block18 / Greater Plutonio (Oct 05)
- Read more
16.08.2005 Sensors for Chevron TAHITI
ClampOn has secured a purchase order from Cameron Celle to supply 8 Deepwater Subsea Sand Monitors for the Chevron TAHITI development in just over 1,200 meter (4,000 feet) of water in the Gulf of Mexico. (Aug. 05)
- Read more
15.04.2005 ClampOn’s largest contract
ClampOn has won its largest contract for sand sensors in the company’s history. Australian oil and gas major Woodside Energy Ltd has recently raised a purchase order for supply of 102 ClampOn DSP Particle Monitors for the North Rankin and Goodwyn platforms, offshore Western Australia. (April 05)
- Read more
11.04.2005 Sand & Erosion Workshop
ClampOn hosted a workshop on Sand & Erosion Monitoring in Aberdeen in March. The seminar aimed to exchange knowledge and experience in sand and erosion monitoring, and to give the participants useful information regarding sand management. (Apr 05)
- Read more
04.04.2005 OPC Client Plug-In
As part of a delivery to Kvaerner, ClampOn is to develop an OPC (OLE for Process Control) client plug-in for the Sand Monitor 3.0 software (March 05)
- Read more
26.01.2005 Subsea sensors to BritSat
ClampOn has won a contract to supply non-intrusive Ultrasonic Subsea Sensors to BritSat, UK. The equipment will be delivered to the contractor in May 2005.(Jan.05)
- Read more
05.01.2005 Donation to the Red Cross
ClampOn has donated NOK 50.000 to the Red Cross for helping children and families affected by the earthquake and tsunami in the Indian Ocean.(January 05)
- Read more
22.12.2004 Centrica Rough Contract
ClampOn has been awarded a major contract for delivery of ClampOn DSP Particle Monitors to the Rough Field in the UK sector of the North Sea. (22.Dec.04)
- Read more
12.10.2004 DNB NOR Corporate Prize
ClampOn has been awarded the DNB NOR’s Corporate Prize for 2004. This annual event is highly recognized by the industry, and it is an honor to win this prize. The idea behind the award is to encourage and strengthen development of the local industry in the greater Bergen area. (October.04)
- Read more
01.09.2004 Winner of portable DVD-player
ClampOn arranged a draw of portable DVD-player amongst visitors who left their business card in a bowl at our stand at the ONS show in Stavanger. The draw was made on Friday 27th by Mr. Joachim Nielsen of Total Catcher Offshore. The winner was Mr. Vidar Nordstrand from Seaproof Solutions (August 04)
- Read more
19.12.2003 Major order for Total Dalia
ClampOn has been awarded the contract to supply ultrasonic sand monitors to the Total Dalia project offshore Angola. This is one of the largest orders for subsea sensors that have ever been placed. Deliveries will start in early 2004 and are scheduled to last for more than two years. (Dec 03)
- Read more
12.12.2003 Contract for offshore project in Nigeria
ClampOn has received a large order of topside sand monitors for an offshore project in Nigeria. The sensors will be supplied as a fast track project, following an already received order for subsea sensors for the same field. (Dec 03)
- Read more
26.11.2003 Entrepreneur Of the Year
Dag A. Aldal and Geir Instanes, founders of ClampOn were awarded the Entrepreneur Of the Year 2003, Region West, Norway. (November 2003)
- Read more
22.10.2003 Topside sensors for Ram Powell TLP
ClampOn is awarded a contract from Shell Offshore, Inc. for their Ram Powell Tension Leg Platform. The delivery of multiple ClampOn DSP Particle Monitors will take place December this year and is meant as a replacement for an existing ultrasonic sand monitoring system made by others. (Oct 03)
- Read more
22.09.2003 Pig detectors to Azerbaijan
ClampOn has received an order for multiple pig detectors for the Azeri project in Azerbaijan. The field is operated by AIOC / BP. (Sept 03)
- Read more
10.09.2003 Deepwater Pig Detectors to ExxonMobil's ERHA project
Cameron has awarded ClampOn the contract to supply 8 deepwater pig detectors to the ERHA project offshore Nigeria. (September 03)
- Read more
28.08.2003 Non-intrusive pig Detectors to BP Atlantis
BP has choosen ClampOn DSP Pig detectors for the Atlantis project in the Gulf of Mexico. We are pleased to see that BP appreciate our investment in ultrasonic technology, quality and service, says Sam Barton, Sales Manager at ClampOn, Inc. This contract follows recent deliveries of non-intrusive pig detectors for BP's Thunderhorse, Holstein and Mad Dog in GoM. (August 03)
- Read more
04.08.2003 ClampOn supplies Sand Monitoring System for ConocoPhillips in China
ClampOn has won a contract for supply of non-intrusive sand monitoring system for ConocoPhillips in China. The system which is soon to be installed on the Peng Lai (PL)19-3A field in Bohai Bay is capable of monitoring up to 32 wells. (August 03)
- Read more
24.07.2003 Subsea Contract for Baobab field
FMC Kongsberg Subsea orders 10 subsea sand detectors for the CNR operated Baobab Oil Field, offshore Ivory Coast in Western Africa. (july 03)
- Read more
20.05.2003 New orders for ClampOn
Shell has awarded ClampOn an order for subsea sand monitoring sensors on the Glider project in GoM. (May 2003)
- Read more
13.05.2003 ClampOn Corrosion-Erosion Monitor
ClampOn is proud to present its DSP Corrosion-Erosion Monitor (CEM) for the petroleum and process industries. The instrument is based on the well proven ClampOn DSP sensor platform that is already widely used for subsea and topside particle and pig monitoring. (May 2003).
- Read more
04.04.2003 Sand Monitoring Workshop
ClampOn hosted a workshop on sand monitoring and production optimization in Aberdeen in March. (April 03)
- Read more
28.03.2003 Sand monitoring on Sakhalin-1
ClampOn has won a contract from Exxon Neftegas for the Sakhalin-1 project. (March 03)
- Read more